ITAC Assessment: UD1147
ITAC logo
ITAC Assessment: UD1147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Warehousing, storage, packaging of general merchandise
NAICS 493110: General Warehousing and Storage
SIC 4225: General Warehousing and Storage
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 220,000
ft2
Annual Production 1,001
units
Production Hrs. Annual 7,344
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,535 1,074,420
kWh
Electricity Demand $4,924 2,105
kW-mo/yr
Electricity Fees $17,890 -
Natural Gas $91,372 9,877
MMBtu
TOTAL YEARLY COSTS $227,721
RECOMMENDED SAVINGS* $26,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,031 $22,391 $10,113
95,681
kWh
$366
-
kW-mo/yr
$2,552
02 2.4231: Reduce the pressure of compressed air to the minimum required $12,303 $2,470 $8,004
75,730
kWh
$362
-
kW-mo/yr
$3,937
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,140 $1,608 $968
9,162
kWh
$172
-
kW-mo/yr
-
TOTAL RECOMMENDED $26,474 $26,469 $19,085
180,573
kWh
$900
-
kW-mo/yr
$6,489
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs