ITAC Assessment: LM0070
ITAC logo
ITAC Assessment: LM0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Industrial Gears
NAICS 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing
SIC 3566: Speed Changers, Industrial High-Speed Drives, and Gears
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 122,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,951 1,782,354
kWh
Electricity Demand $36,097 4,440
kW-mo/yr
Electricity Fees $26,798 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,708,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $892,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 2.7122: Disconnect ballasts $4,442 - $3,681
33,097
kWh
$761
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $1,970 $110 $1,778
15,989
kWh
$192
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,542 $1,950 $2,917
26,230
kWh
$625
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,020 $1,000 $840
7,510
kWh
$180
-
kW-mo/yr
- - -
05 2.6212: Turn off equipment during breaks, reduce operating time $486 - $412
3,716
kWh
$74
-
kW-mo/yr
- - -
06 2.7229: Air condition only space necessary $3,254 $3,050 $3,119
28,032
kWh
$135
-
kW-mo/yr
- - -
07 4.454: Modify startup/shutdown times $13,976 $1,000 - - - $13,976 -
08 4.452: Eliminate shift $15,698 $1,000 $15,698
129,683
kWh
- - - -
09 4.426: Modify workload $855,000 $50,000 - - $(-20,000.0) - $875,000
10 4.431: Train operators for maximum operating efficiency $525,000 $21,000 - - - - $525,000
11 3.7141: Improve cleaning efficiency by maintaining cleaning system $283,680 $6,000 - - $283,680 - -
TOTAL RECOMMENDED $1,708,068 $85,110 $28,445
244,257
kWh
$1,967
-
kW-mo/yr
$263,680 $13,976 $1,400,000
TOTAL IMPLEMENTED $892,592 $53,110 $22,409
189,995
kWh
$1,207
-
kW-mo/yr
$(-20,000.0) $13,976 $875,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs