Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

46

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Refrigerated warehousing and storage
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0554 #08 Y:2023 Use photocell controls $805 $1,700
AS0554 #07 Y:2023 Install occupancy sensors $1,513 $1,560
AS0554 #06 Y:2023 Install vinyl strip / high speed / air curtain doors $1,609 $1,858
AS0554 #05 Y:2023 Install timers on light switches in little used areas $2,680 $600
AS0554 #04 Y:2023 Use computer programs to optimize hvac performance $2,798 $2,970
AS0554 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $3,704 $6,059
AS0554 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $5,520 $2,832
AS0554 #01 Y:2023 Use solar heat to make electricty $28,395 $281,442
IC0272 #05 Y:2022 Lower temperature during the winter season and vice-versa $341 $35
IC0272 #04 Y:2022 Air condition only space necessary $647 -
IC0272 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $562 $1,098
IC0272 #02 Y:2022 Install vinyl strip / high speed / air curtain doors $2,712 $3,525
IC0272 #01 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $16,198 $10,487
CW0124 #07 Y:2022 Replace treated water with well / surface water $1,505 $2,582
CW0124 #06 Y:2022 Utilize higher efficiency lamps and/or ballasts $929 $1,866
CW0124 #05 Y:2022 Modify workload $16,860 -
CW0124 #04 Y:2022 Replace old machine with new automatic multi-station tool $7,380 -
CW0124 #03 Y:2022 User battery storage for power quality issues $230,341 $287,555
CW0124 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $17,378 $47,373
CW0124 #01 Y:2022 Utilize energy-efficient belts and other improved mechanisms $1,407 $100