Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

757

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Manufacturing industries, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0102 #03 Y:2001 Improve air circulation with destratification fans / other methods $758 $1,323
SU0102 #02 Y:2001 Develop standard procedures to improve internal yields $4,867 $234
SU0102 #01 Y:2001 Reduce the pressure of compressed air to the minimum required $48 -
HO0236 #12 Y:2000 Regrind, reuse, or sell scrap plastic parts $175 $500
HO0236 #11 Y:2000 Meter waste water $1,000 $250
HO0236 #10 Y:2000 Add/modify equipment to improve drying process $419,000 $30,000
HO0236 #09 Y:2000 Improve space comfort conditioning $1,160 $335
HO0236 #08 Y:2000 Optimize production lot sizes and inventories $1,912 $5,880
HO0236 #07 Y:2000 Eliminate old stock and modify inventory control $7,650 $5,000
HO0236 #06 Y:2000 Purchase gas directly from a contract gas supplier $985 $250
HO0236 #05 Y:2000 Change rate schedules or other changes in utility service $4,374 $20,000
HO0236 #04 Y:2000 Eliminate leaks in inert gas and compressed air lines/ valves $1,167 $120
HO0236 #03 Y:2000 Install compressor air intakes in coolest locations $332 $400
HO0236 #02 Y:2000 Reduce the pressure of compressed air to the minimum required $402 $15
HO0236 #01 Y:2000 Install occupancy sensors $3,159 $2,800
AM0361 #08 Y:1999 Install / repair insulation on steam lines $430 $120
AM0361 #07 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $410 $100
AM0361 #06 Y:1999 Disconnect ballasts $1,930 $300
AM0361 #05 Y:1999 Pay bills on time to avoid late fees $4,274 -
AM0361 #04 Y:1999 Disconnect ballasts $4,920 $600