Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

733

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Manufacturing industries, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0708 #11 Y:2004 Utilize higher efficiency lamps and/or ballasts $3,678 $10,931
UD0708 #10 Y:2004 Remove or close off unneeded compressed air lines $4,013 $780
UD0708 #09 Y:2004 Turn off equipment when not in use $5,451 -
UD0708 #08 Y:2004 Utilize higher efficiency lamps and/or ballasts $10,364 $20,952
UD0708 #07 Y:2004 Analyze flue gas for proper air/fuel ratio $20,091 -
UD0708 #06 Y:2004 Turn off equipment when not in use $22,586 -
UD0708 #05 Y:2004 Install rotating carousels to reduce set-up times $39,175 $120,100
UD0708 #04 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $41,459 $3,900
UD0708 #03 Y:2004 Use waste heat from hot flue gases to preheat $45,575 $35,400
UD0708 #02 Y:2004 Disconnect ballasts $53,161 $3,105
UD0708 #01 Y:2004 Re-arrange equipment layout to reduce handling costs $625,410 $325,000
UU0070 #05 Y:2004 Use / purchase optimum sized compressor $70,000 $18,000
UU0070 #04 Y:2004 Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $73,401 $750,000
UU0070 #03 Y:2004 Optimize plant power factor $16,729 $26,520
UU0070 #02 Y:2004 Install compressor air intakes in coolest locations $95,199 -
UU0070 #01 Y:2004 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,370,474 $22,000,000
SU0193 #09 Y:2004 Use waste heat from hot flue gases to preheat $3,340 $10,000
SU0193 #08 Y:2004 Use / purchase optimum sized compressor $4,989 $10,421
SU0193 #07 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,158 $2,415
SU0193 #06 Y:2004 Recover waste heat from equipment $489 $304