733
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Manufacturing industries, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0708 #11 Y:2004 | 11 | 2004 | Utilize higher efficiency lamps and/or ballasts | $3,678 | $10,931 | |
| UD0708 #10 Y:2004 | 10 | 2004 | Remove or close off unneeded compressed air lines | $4,013 | $780 | |
| UD0708 #09 Y:2004 | 09 | 2004 | Turn off equipment when not in use | $5,451 | - | |
| UD0708 #08 Y:2004 | 08 | 2004 | Utilize higher efficiency lamps and/or ballasts | $10,364 | $20,952 | |
| UD0708 #07 Y:2004 | 07 | 2004 | Analyze flue gas for proper air/fuel ratio | $20,091 | - | |
| UD0708 #06 Y:2004 | 06 | 2004 | Turn off equipment when not in use | $22,586 | - | |
| UD0708 #05 Y:2004 | 05 | 2004 | Install rotating carousels to reduce set-up times | $39,175 | $120,100 | |
| UD0708 #04 Y:2004 | 04 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $41,459 | $3,900 | |
| UD0708 #03 Y:2004 | 03 | 2004 | Use waste heat from hot flue gases to preheat | $45,575 | $35,400 | |
| UD0708 #02 Y:2004 | 02 | 2004 | Disconnect ballasts | $53,161 | $3,105 | |
| UD0708 #01 Y:2004 | 01 | 2004 | Re-arrange equipment layout to reduce handling costs | $625,410 | $325,000 | |
| UU0070 #05 Y:2004 | 05 | 2004 | Use / purchase optimum sized compressor | $70,000 | $18,000 | |
| UU0070 #04 Y:2004 | 04 | 2004 | Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $73,401 | $750,000 | |
| UU0070 #03 Y:2004 | 03 | 2004 | Optimize plant power factor | $16,729 | $26,520 | |
| UU0070 #02 Y:2004 | 02 | 2004 | Install compressor air intakes in coolest locations | $95,199 | - | |
| UU0070 #01 Y:2004 | 01 | 2004 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $1,370,474 | $22,000,000 | |
| SU0193 #09 Y:2004 | 09 | 2004 | Use waste heat from hot flue gases to preheat | $3,340 | $10,000 | |
| SU0193 #08 Y:2004 | 08 | 2004 | Use / purchase optimum sized compressor | $4,989 | $10,421 | |
| SU0193 #07 Y:2004 | 07 | 2004 | Utilize higher efficiency lamps and/or ballasts | $1,158 | $2,415 | |
| SU0193 #06 Y:2004 | 06 | 2004 | Recover waste heat from equipment | $489 | $304 |