Assessment Year | 2004 |
---|---|
Principal Product | dialysis solutions |
NAICS | 339999: All Other Miscellaneous Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 750 |
Plant Area |
n/a
|
Annual Production | 35,000,000
pieces
|
Production Hrs. Annual | 0
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,655,336 | 77,792,000 |
kWh
|
$0.021 |
Electricity Demand | $770,839 | 121,392 |
kW-mo/yr
|
$6.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,625,803 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $238,600 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Water Consumption Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $1,370,474 | $22,000,000 |
$1,724,447
74,256,000
kWh
|
$849,489
-
kW-mo/yr
|
$(-1,203,462.0)
-
MMBtu
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $95,199 | - |
$64,712
2,786,588
kWh
|
$30,487
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.3212: Optimize plant power factor | $16,729 | $26,520 | - |
$16,729
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $73,401 | $750,000 | - | - | - |
$12,919
-
Tgal
|
$60,482
-
Tgal
|
- | |
05 | 2.4226: Use / purchase optimum sized compressor | $70,000 | $18,000 | - | - | - | - | - | $70,000 | |
TOTAL RECOMMENDED | $1,625,803 | $22,794,520 |
$1,789,159
77,042,588
kWh
|
$896,705
-
kW-mo/yr
|
$(-1,203,462.0)
-
MMBtu
|
$12,919
-
Tgal
|
$60,482
-
Tgal
|
$70,000 | ||
TOTAL IMPLEMENTED | $238,600 | $768,000 |
$64,712
2,786,588
kWh
|
$30,487
-
kW-mo/yr
|
- |
$12,919
-
Tgal
|
$60,482
-
Tgal
|
$70,000 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs