ITAC Assessment: UU0070
ITAC logo
ITAC Assessment: UU0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product dialysis solutions
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 750
Plant Area
n/a
Annual Production 35,000,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,655,336 77,792,000
kWh
Electricity Demand $770,839 121,392
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,625,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $238,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $1,370,474 $22,000,000 $1,724,447
74,256,000
kWh
$849,489
-
kW-mo/yr
$(-1,203,462.0)
-
MMBtu
- - -
02 2.4221: Install compressor air intakes in coolest locations $95,199 - $64,712
2,786,588
kWh
$30,487
-
kW-mo/yr
- - - -
03 2.3212: Optimize plant power factor $16,729 $26,520 - $16,729
-
kW-mo/yr
- - - -
04 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $73,401 $750,000 - - - $12,919
-
Tgal
$60,482
-
Tgal
-
05 2.4226: Use / purchase optimum sized compressor $70,000 $18,000 - - - - - $70,000
TOTAL RECOMMENDED $1,625,803 $22,794,520 $1,789,159
77,042,588
kWh
$896,705
-
kW-mo/yr
$(-1,203,462.0)
-
MMBtu
$12,919
-
Tgal
$60,482
-
Tgal
$70,000
TOTAL IMPLEMENTED $238,600 $768,000 $64,712
2,786,588
kWh
$30,487
-
kW-mo/yr
- $12,919
-
Tgal
$60,482
-
Tgal
$70,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs