Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Manufacturing industries, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0590 #11 Y:2026 Use solar heat to make electricty $194,971 $2,475,576
SU0590 #10 Y:2026 Use heat pump for space conditioning $3,862 $15,792
SU0590 #09 Y:2026 Install vinyl strip / high speed / air curtain doors $225 $792
SU0590 #08 Y:2026 Conserve energy by efficient use of vending machines $171 $520
SU0590 #07 Y:2026 Install / repair insulation on steam lines $562 $1,047
SU0590 #06 Y:2026 Use or replace with energy efficient substitutes $261 $392
SU0590 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $945 $886
SU0590 #04 Y:2026 Use or replace with energy efficient substitutes $515 $38
SU0590 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $936 $40
SU0590 #02 Y:2026 Eliminate or reduce compressed air usage $1,332 -
SU0590 #01 Y:2026 Apply for tax-free status for energy purchases $1,330 $30
SU0501 #05 Y:2021 Reduce ventilation air $273 $882
SU0501 #04 Y:2021 Install compressor air intakes in coolest locations $556 $999
SU0501 #03 Y:2021 Eliminate/reduce an operation $2,583 $2,772
SU0501 #02 Y:2021 Disconnect ballasts $919 $180
SU0501 #01 Y:2021 Eliminate/reduce an operation $557 $20
SU0193 #09 Y:2004 Use waste heat from hot flue gases to preheat $3,340 $10,000
SU0193 #08 Y:2004 Use / purchase optimum sized compressor $4,989 $10,421
SU0193 #07 Y:2004 Utilize higher efficiency lamps and/or ballasts $1,158 $2,415
SU0193 #06 Y:2004 Recover waste heat from equipment $489 $304