ITAC Assessment: SU0501
ITAC logo
ITAC Assessment: SU0501
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Compressors
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 105
Plant Area 250,000
ft2
Annual Production 45,000
units
Production Hrs. Annual 3,536
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,915 2,903,095
kWh
Electricity Demand $100,920 11,196
kW-mo/yr
Electricity Fees $8,322 -
Natural Gas $19,044 4,266
MMBtu
TOTAL YEARLY COSTS $175,201
RECOMMENDED SAVINGS* $4,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 3.1161: Eliminate/reduce an operation $557 $20 $92
5,737
kWh
$174
-
kW-mo/yr
$291
-
MMBtu
-
02 2.7122: Disconnect ballasts $919 $180 $519
32,412
kWh
$400
-
kW-mo/yr
- -
03 3.1161: Eliminate/reduce an operation $2,583 $2,772 $0
30
kWh
$12
-
kW-mo/yr
- $2,571
04 2.4221: Install compressor air intakes in coolest locations $556 $999 $556
34,723
kWh
- - -
05 2.7314: Reduce ventilation air $273 $882 $28
1,757
kWh
- $245
-
MMBtu
-
TOTAL RECOMMENDED $4,888 $4,853 $1,195
74,659
kWh
$586
-
kW-mo/yr
$536
-
MMBtu
$2,571
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs