ITAC Assessment: CO0337
ITAC logo
ITAC Assessment: CO0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product R.V. Awnings
NAICS
n/a
SIC 2394: Canvas and Related Products
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 140,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 2,574
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,506 1,174,678
kWh
Natural Gas $8,673 2,111
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,830 $41,260 $12,830
185,229
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,370 $3,620 $(-130.0)
(-1,758)
kWh
$1,500
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,130 $260 $1,130
14,654
kWh
-
04 2.7224: Reduce space conditioning during non-working hours $960 $1,000 - $960
-
MMBtu
05 2.4133: Use most efficient type of electric motors $500 $910 $500
7,327
kWh
-
TOTAL RECOMMENDED $16,790 $47,050 $14,330
205,452
kWh
$2,460
-
MMBtu
TOTAL IMPLEMENTED $1,630 $1,170 $1,630
21,981
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs