ITAC Assessment: AM0426
ITAC logo
ITAC Assessment: AM0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Composite Aircraft Engine Fan Blades
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 160,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 6,024
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,246 9,172,000
kWh
Electricity Demand $34,628 20,860
kW-mo/yr
Natural Gas $56,358 8,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.7132: Reuse rags until completely soiled $5,330 - - - $5,330
-
lb
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,310 $1,460 $610
12,980
kWh
$30
-
kW-mo/yr
- $2,670
03 2.6212: Turn off equipment during breaks, reduce operating time $1,950 - $1,950
41,590
kWh
- - -
04 2.7124: Make a practice of turning off lights when not needed $1,420 - $1,420
30,240
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $820 $500 $820
17,400
kWh
- - -
TOTAL RECOMMENDED $12,830 $1,960 $4,800
102,210
kWh
$30
-
kW-mo/yr
$5,330
-
lb
$2,670
TOTAL IMPLEMENTED $820 $500 $820
17,400
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs