| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK1011 #09 Y:2019 | 09 | 2019 | Adjust / maintain fork lift trucks for most efficient operation | $1,628 | - | |
| OK1011 #08 Y:2019 | 08 | 2019 | Install smaller boiler (increase high fire duty cycle) | $18,744 | $35,736 | |
| OK1011 #07 Y:2019 | 07 | 2019 | Install set-back timers | $480 | $240 | |
| OK1011 #06 Y:2019 | 06 | 2019 | Insulate bare equipment | $5,110 | $63 | |
| OK1011 #05 Y:2019 | 05 | 2019 | Optimize plant power factor | $13,080 | $57,161 | |
| OK1011 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $43,176 | $71,250 | |
| OK1011 #03 Y:2019 | 03 | 2019 | Utilize higher efficiency lamps and/or ballasts | $3,937 | $15,573 | |
| OK1011 #02 Y:2019 | 02 | 2019 | Reduce the pressure of compressed air to the minimum required | $5,528 | $8,106 | |
| OK1011 #01 Y:2019 | 01 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,499 | $1,898 | |
| OK0602 #08 Y:2000 | 08 | 2000 | Contract a wood pallet recycling company | $8,333 | - | |
| OK0602 #07 Y:2000 | 07 | 2000 | Install equipment to move product | $122,640 | $200,000 | |
| OK0602 #06 Y:2000 | 06 | 2000 | Install equipment to move product | $229,950 | $32,400 | |
| OK0602 #05 Y:2000 | 05 | 2000 | Install occupancy sensors | $276 | $1,620 | |
| OK0602 #04 Y:2000 | 04 | 2000 | Install skylights | $9,262 | $5,460 | |
| OK0602 #03 Y:2000 | 03 | 2000 | Use cooling tower or economizer to replace chiller cooling | $26,183 | $35,000 | |
| OK0602 #02 Y:2000 | 02 | 2000 | Preheat combustion air with waste heat | $2,001 | $10,500 | |
| OK0602 #01 Y:2000 | 01 | 2000 | Reduce the pressure of compressed air to the minimum required | $15,151 | $14,545 | |
| OK0341 #10 Y:1991 | 10 | 1991 | Use waste heat from hot flue gases to preheat | $26,053 | $16,500 | |
| OK0341 #09 Y:1991 | 09 | 1991 | Install compressor air intakes in coolest locations | $2,226 | $2,900 | |
| OK0341 #08 Y:1991 | 08 | 1991 | Repair and eliminate steam leaks | $443 | $740 |