Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Linoleum, asphalted-felt-base, and other hard surface floor coverings, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1011 #09 Y:2019 Adjust / maintain fork lift trucks for most efficient operation $1,628 -
OK1011 #08 Y:2019 Install smaller boiler (increase high fire duty cycle) $18,744 $35,736
OK1011 #07 Y:2019 Install set-back timers $480 $240
OK1011 #06 Y:2019 Insulate bare equipment $5,110 $63
OK1011 #05 Y:2019 Optimize plant power factor $13,080 $57,161
OK1011 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $43,176 $71,250
OK1011 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $3,937 $15,573
OK1011 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $5,528 $8,106
OK1011 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $7,499 $1,898
OK0602 #08 Y:2000 Contract a wood pallet recycling company $8,333 -
OK0602 #07 Y:2000 Install equipment to move product $122,640 $200,000
OK0602 #06 Y:2000 Install equipment to move product $229,950 $32,400
OK0602 #05 Y:2000 Install occupancy sensors $276 $1,620
OK0602 #04 Y:2000 Install skylights $9,262 $5,460
OK0602 #03 Y:2000 Use cooling tower or economizer to replace chiller cooling $26,183 $35,000
OK0602 #02 Y:2000 Preheat combustion air with waste heat $2,001 $10,500
OK0602 #01 Y:2000 Reduce the pressure of compressed air to the minimum required $15,151 $14,545
OK0341 #10 Y:1991 Use waste heat from hot flue gases to preheat $26,053 $16,500
OK0341 #09 Y:1991 Install compressor air intakes in coolest locations $2,226 $2,900
OK0341 #08 Y:1991 Repair and eliminate steam leaks $443 $740