Assessment Year | 2000 |
---|---|
Principal Product | Vinyl flooring |
NAICS |
n/a
|
SIC | 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
435,000
ft2
|
Annual Production | 42,000,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $902,876 | 24,038,394 |
kWh
|
$0.038 |
Electricity Fees | $3,538 | - |
|
- |
Natural Gas | $571,959 | 226,827 |
MMBtu
|
$2.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $413,796 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,151 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,151 | $14,545 |
$15,151
402,989
kWh
|
- | - | - | |
02 | 2.2442: Preheat combustion air with waste heat | $2,001 | $10,500 | - |
$2,001
-
MMBtu
|
- | - | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $26,183 | $35,000 |
$26,183
696,366
kWh
|
- | - | - | |
04 | 2.7145: Install skylights | $9,262 | $5,460 |
$9,262
246,483
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $276 | $1,620 |
$276
7,327
kWh
|
- | - | - | |
06 | 4.445: Install equipment to move product | $229,950 | $32,400 | - | - | - | $229,950 | |
07 | 4.445: Install equipment to move product | $122,640 | $200,000 | - | - | - | $122,640 | |
08 | 3.5316: Contract a wood pallet recycling company | $8,333 | - | - | - |
$8,333
-
lb
|
- | |
TOTAL RECOMMENDED | $413,796 | $299,525 |
$50,872
1,353,165
kWh
|
$2,001
-
MMBtu
|
$8,333
-
lb
|
$352,590 | ||
TOTAL IMPLEMENTED | $15,151 | $14,545 |
$15,151
402,989
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs