ITAC Assessment: OK0602
ITAC logo
ITAC Assessment: OK0602
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Vinyl flooring
NAICS
n/a
SIC 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 435,000
ft2
Annual Production 42,000,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $902,876 24,038,394
kWh
Electricity Fees $3,538 -
Natural Gas $571,959 226,827
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $413,796 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,151

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $15,151 $14,545 $15,151
402,989
kWh
- - -
02 2.2442: Preheat combustion air with waste heat $2,001 $10,500 - $2,001
-
MMBtu
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $26,183 $35,000 $26,183
696,366
kWh
- - -
04 2.7145: Install skylights $9,262 $5,460 $9,262
246,483
kWh
- - -
05 2.7135: Install occupancy sensors $276 $1,620 $276
7,327
kWh
- - -
06 4.445: Install equipment to move product $229,950 $32,400 - - - $229,950
07 4.445: Install equipment to move product $122,640 $200,000 - - - $122,640
08 3.5316: Contract a wood pallet recycling company $8,333 - - - $8,333
-
lb
-
TOTAL RECOMMENDED $413,796 $299,525 $50,872
1,353,165
kWh
$2,001
-
MMBtu
$8,333
-
lb
$352,590
TOTAL IMPLEMENTED $15,151 $14,545 $15,151
402,989
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs