Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Burial caskets
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0735 #16 Y:2005 Insulate bare equipment $245 $110
UD0735 #15 Y:2005 Remove or close off unneeded compressed air lines $376 $214
UD0735 #14 Y:2005 Use photocell controls $733 $308
UD0735 #13 Y:2005 Utilize energy-efficient belts and other improved mechanisms $2,293 -
UD0735 #12 Y:2005 Recover and reuse cooling water $2,635 $1,000
UD0735 #11 Y:2005 Reduce the pressure of compressed air to the minimum required $2,665 -
UD0735 #10 Y:2005 Size electric motors for peak operating efficiency $2,932 -
UD0735 #09 Y:2005 Use only amount of air necessary to prevent explosion hazard $3,767 $700
UD0735 #08 Y:2005 Use adjustable frequency drive or multiple speed motors on existing system $4,043 $9,000
UD0735 #07 Y:2005 Install occupancy sensors $5,203 $21,789
UD0735 #06 Y:2005 Disconnect ballasts $9,527 $1,440
UD0735 #05 Y:2005 Re-size charging openings or add movable cover or door $14,908 $5,056
UD0735 #04 Y:2005 Reduce ventilation air $38,385 -
UD0735 #03 Y:2005 Recover mechanical energy $33,450 $32
UD0735 #02 Y:2005 Use plant owned transformers or lease transformers $36,368 $5,000
UD0735 #01 Y:2005 Lower temperature during the winter season and vice-versa $212,325 $9,000
UD0308 #05 Y:1989 Utilize higher efficiency lamps and/or ballasts $861 $1,050
UD0308 #04 Y:1989 Reduce illumination to minimum necessary levels $2,904 $900
UD0308 #03 Y:1989 Reschedule plant operations or reduce load to avoid peaks $6,831 -
UD0308 #02 Y:1989 Treat and reuse rinse waters $5,588 $2,000