21
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Burial caskets | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0735 #16 Y:2005 | 16 | 2005 | Insulate bare equipment | $245 | $110 | |
| UD0735 #15 Y:2005 | 15 | 2005 | Remove or close off unneeded compressed air lines | $376 | $214 | |
| UD0735 #14 Y:2005 | 14 | 2005 | Use photocell controls | $733 | $308 | |
| UD0735 #13 Y:2005 | 13 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $2,293 | - | |
| UD0735 #12 Y:2005 | 12 | 2005 | Recover and reuse cooling water | $2,635 | $1,000 | |
| UD0735 #11 Y:2005 | 11 | 2005 | Reduce the pressure of compressed air to the minimum required | $2,665 | - | |
| UD0735 #10 Y:2005 | 10 | 2005 | Size electric motors for peak operating efficiency | $2,932 | - | |
| UD0735 #09 Y:2005 | 09 | 2005 | Use only amount of air necessary to prevent explosion hazard | $3,767 | $700 | |
| UD0735 #08 Y:2005 | 08 | 2005 | Use adjustable frequency drive or multiple speed motors on existing system | $4,043 | $9,000 | |
| UD0735 #07 Y:2005 | 07 | 2005 | Install occupancy sensors | $5,203 | $21,789 | |
| UD0735 #06 Y:2005 | 06 | 2005 | Disconnect ballasts | $9,527 | $1,440 | |
| UD0735 #05 Y:2005 | 05 | 2005 | Re-size charging openings or add movable cover or door | $14,908 | $5,056 | |
| UD0735 #04 Y:2005 | 04 | 2005 | Reduce ventilation air | $38,385 | - | |
| UD0735 #03 Y:2005 | 03 | 2005 | Recover mechanical energy | $33,450 | $32 | |
| UD0735 #02 Y:2005 | 02 | 2005 | Use plant owned transformers or lease transformers | $36,368 | $5,000 | |
| UD0735 #01 Y:2005 | 01 | 2005 | Lower temperature during the winter season and vice-versa | $212,325 | $9,000 | |
| UD0308 #05 Y:1989 | 05 | 1989 | Utilize higher efficiency lamps and/or ballasts | $861 | $1,050 | |
| UD0308 #04 Y:1989 | 04 | 1989 | Reduce illumination to minimum necessary levels | $2,904 | $900 | |
| UD0308 #03 Y:1989 | 03 | 1989 | Reschedule plant operations or reduce load to avoid peaks | $6,831 | - | |
| UD0308 #02 Y:1989 | 02 | 1989 | Treat and reuse rinse waters | $5,588 | $2,000 |