ITAC Assessment: CL2013
ITAC logo
ITAC Assessment: CL2013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Fiberglass products, i.e. light poles, handles, cross arms
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3995: Burial Caskets
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 250,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $398,404 5,253,171
kWh
Electricity Demand $206,131 12,883
kW-mo/yr
Electricity Fees $1,289 -
Natural Gas $115,236 1,301
MMBtu
Waste Disposal Costs
Water Usage $7,742 102
Tgal
Water Disposal $11,816 102
Tgal
TOTAL YEARLY COSTS $740,618
RECOMMENDED SAVINGS* $46,904 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,904

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $34,650 $33,470 $25,725
339,198
kWh
$8,925
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,416 $4,336 $1,088
14,349
kWh
$328
-
kW-mo/yr
-
03 2.2522: Isolate hot or cold equipment $1,527 $461 - - $1,527
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $9,311 - $6,625
87,361
kWh
$2,686
-
kW-mo/yr
-
TOTAL RECOMMENDED $46,904 $38,267 $33,439
440,908
kWh
$11,939
-
kW-mo/yr
$1,527
-
MMBtu
TOTAL IMPLEMENTED $46,904 $38,267 $33,439
440,908
kWh
$11,939
-
kW-mo/yr
$1,527
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs