Assessment Year | 2016 |
---|---|
Principal Product | Wooden Burial Caskets |
NAICS | 339995: Burial Casket Manufacturing |
SIC | 3995: Burial Caskets |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
71,108
ft2
|
Annual Production | 1,474
pieces
|
Production Hrs. Annual | 2,168
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $21,591 | 229,040 |
kWh
|
$0.094 |
Electricity Demand | $3,199 | 1,546 |
kW-mo/yr
|
$2.07 |
Electricity Fees | $240 | - |
|
- |
Natural Gas | $19,190 | 2,255 |
MMBtu
|
$8.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,438 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,438 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $839 | - |
$748
7,932
kWh
|
$91
-
kW-mo/yr
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $398 | $5 |
$361
3,251
kWh
|
$38
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,306 | $250 |
$3,306
35,060
kWh
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $5,082 | $700 |
$5,082
53,899
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $538 | $878 |
$480
5,094
kWh
|
$58
-
kW-mo/yr
|
|
06 | 2.7135: Install occupancy sensors | $382 | $888 |
$382
4,053
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $893 | $3,007 |
$796
8,444
kWh
|
$97
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $11,438 | $5,728 |
$11,155
117,733
kWh
|
$284
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $11,438 | $5,728 |
$11,155
117,733
kWh
|
$284
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs