Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Rubber Boots
NAICS
n/a
SIC 3021: Rubber and Plastics Footwear
Sales Range $50
M
to 100
M
# of Employees 495
Plant Area 196,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,858 819,168
kWh
Natural Gas $60,497 13,016
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,681 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $3,941 $1,000 n/a $3,941
59,203
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,148 $6,967 n/a $4,148
62,427
kWh
-
03 2.7135: Install occupancy sensors $2,052 $500 n/a $2,052
30,774
kWh
-
04 2.4133: Use most efficient type of electric motors $1,877 $15,000 n/a $1,877
28,136
kWh
-
05 2.8113: Purchase gas directly from a contract gas supplier $70,663 $1,500 n/a - $70,663
TOTAL RECOMMENDED $82,681 $24,967 $12,018
180,540
kWh
$70,663
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs