ITAC Assessment: MA0067
ITAC logo
ITAC Assessment: MA0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product NOZZLES
NAICS
n/a
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,694 757,913
kWh
LPG $13,720 1,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $746

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7229: Air condition only space necessary $262 - $262
3,224
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $125 $150 - $125
-
MMBtu
03 2.2444: Use hot process fluids to preheat incoming process fluids $484 $900 - $484
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,076 $7,000 $3,076
38,394
kWh
-
05 2.2437: Recover waste heat from equipment $1,611 $4,710 $(-23.0)
(-293)
kWh
$1,634
-
MMBtu
TOTAL RECOMMENDED $5,558 $12,760 $3,315
41,325
kWh
$2,243
-
MMBtu
TOTAL IMPLEMENTED $746 $900 $262
3,224
kWh
$484
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs