Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

356

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Signs and advertising specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0006 #04 Y:2007 Disconnect ballasts $497 $216
UA0006 #03 Y:2007 Utilize energy-efficient belts and other improved mechanisms $40 $10
UA0006 #02 Y:2007 Use separate switches on perimeter lighting which may be turned off when natural light is available $2,561 $1,023
UA0006 #01 Y:2007 Use photocell controls $112 $36
BD0306 #08 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $1,310 $900
BD0306 #07 Y:2005 Use most efficient type of electric motors $1,520 $4,820
BD0306 #06 Y:2005 Install occupancy sensors $2,979 $1,350
BD0306 #05 Y:2005 Close holes and openings in building such as broken windows $424 $237
BD0306 #04 Y:2005 Use radiant heater for spot heating $13,127 $27,572
BD0306 #03 Y:2005 Install timers and/or thermostats $15,291 $1,368
BD0306 #02 Y:2005 Direct warmest air to combustion intake $6,891 $4,000
BD0306 #01 Y:2005 Replace obsolete burners with more efficient ones $26,169 $32,500
UU0073 #07 Y:2004 Demolish old building to reduce tax and insurance bills $130 -
UU0073 #06 Y:2004 Add equipment/ operators to reduce production bottleneck $10,500 $15,000
UU0073 #05 Y:2004 Use demand controller or load shedder $2,700 $2,500
UU0073 #04 Y:2004 Reuse / recycle/ sell paper products $2,434 -
UU0073 #03 Y:2004 Install equipment (eg compactor) to reduce disposal costs $990 $6,000
UU0073 #02 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,080 $860
UU0073 #01 Y:2004 Improve air circulation with destratification fans / other methods $8,250 $8,000
BD0267 #13 Y:2004 Automate payroll system $9,750 $2,500