Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

356

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Signs and advertising specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0218 #04 Y:1994 Install occupancy sensors $518 $300
WI0218 #03 Y:1994 Utilize higher efficiency lamps and/or ballasts $1,927 $4,569
WI0218 #02 Y:1994 Schedule routine maintenance during non-operating periods $7,498 -
WI0218 #01 Y:1994 Improve air circulation with destratification fans / other methods $4,760 $8,532
DS0001 #08 Y:1993 Use radiant heater for spot heating $9,150 $34,800
DS0001 #07 Y:1993 Use most efficient type of electric motors $130 $690
DS0001 #06 Y:1993 Use proper thickness of insulation on building envelope $4,760 $44,950
DS0001 #05 Y:1993 Install storm windows and doors $740 $20
DS0001 #04 Y:1993 Install storm windows and doors $1,130 $8,200
DS0001 #03 Y:1993 Install storm windows and doors $140 $280
DS0001 #02 Y:1993 Install occupancy sensors $70 $120
DS0001 #01 Y:1993 Utilize higher efficiency lamps and/or ballasts $2,990 $12,650
MO0065 #07 Y:1992 Reduce hot water temperature to the minimum required $91 $20
MO0065 #06 Y:1992 Use adjustable frequency drive or multiple speed motors on existing system $380 $250
MO0065 #05 Y:1992 Install compressor air intakes in coolest locations $797 $790
MO0065 #04 Y:1992 Reduce the pressure of compressed air to the minimum required $2,412 $20
MO0065 #03 Y:1992 Utilize energy-efficient belts and other improved mechanisms $426 $100
MO0065 #02 Y:1992 Use most efficient type of electric motors $487 $4,400
MO0065 #01 Y:1992 Utilize higher efficiency lamps and/or ballasts $995 -
UD0356 #04 Y:1991 Reschedule plant operations or reduce load to avoid peaks $12,390 -