ITAC Assessment: WI0218
ITAC logo
ITAC Assessment: WI0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Trade show exhibit booths
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 73
Plant Area 15,000
ft2
Annual Production 24
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,641 766,706
kWh
Natural Gas $46,419 11,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,781 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $4,760 $8,532 $(-193.0)
(-2,345)
kWh
$4,953
-
MMBtu
02 2.3135: Schedule routine maintenance during non-operating periods $7,498 - $7,498
-
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,927 $4,569 $1,927
24,033
kWh
-
04 2.7135: Install occupancy sensors $518 $300 $518
6,448
kWh
-
05 2.6241: Reduce temperature of process equipment when on standby $1,260 $1,000 $1,260
46,600
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,148 $500 - $1,148
-
MMBtu
07 2.2437: Recover waste heat from equipment $663 $500 - $663
-
MMBtu
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,007 $1,980 - $1,007
-
MMBtu
TOTAL RECOMMENDED $18,781 $17,381 $11,010
74,736
kWh
$7,771
-
MMBtu
TOTAL IMPLEMENTED $13,406 $9,032 $7,305
(-2,345)
kWh
$6,101
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs