| Assessment Year | 1994 |
|---|---|
| Principal Product | Trade show exhibit booths |
| NAICS |
n/a
|
| SIC | 3993: Signs and Advertising Specialties |
| Sales Range | $10 M to 50M |
| # of Employees | 73 |
| Plant Area |
15,000
ft2
|
| Annual Production | 24
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $61,641 | 766,706 |
kWh
|
$0.080 |
| Natural Gas | $46,419 | 11,559 |
MMBtu
|
$4.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,781 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,406 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $4,760 | $8,532 |
$(-193.0)
(-2,345)
kWh
|
$4,953
-
MMBtu
|
|
| 02 | 2.3135: Schedule routine maintenance during non-operating periods | $7,498 | - |
$7,498
-
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,927 | $4,569 |
$1,927
24,033
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $518 | $300 |
$518
6,448
kWh
|
- | |
| 05 | 2.6241: Reduce temperature of process equipment when on standby | $1,260 | $1,000 |
$1,260
46,600
kWh
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,148 | $500 | - |
$1,148
-
MMBtu
|
|
| 07 | 2.2437: Recover waste heat from equipment | $663 | $500 | - |
$663
-
MMBtu
|
|
| 08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,007 | $1,980 | - |
$1,007
-
MMBtu
|
|
| TOTAL RECOMMENDED | $18,781 | $17,381 |
$11,010
74,736
kWh
|
$7,771
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $13,406 | $9,032 |
$7,305
(-2,345)
kWh
|
$6,101
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs