ITAC Assessment: MO0065
ITAC logo
ITAC Assessment: MO0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product OFFICE ACCESSORIES
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $5
M
to 10
M
# of Employees 160
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,668 1,758,793
kWh
Natural Gas $8,409 1,969
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $888

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $995 - $1,235
18,464
kWh
$(-240.0)
02 2.4133: Use most efficient type of electric motors $487 $4,400 $487
7,327
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $426 $100 $426
6,448
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,412 $20 $2,412
35,756
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $797 $790 $797
11,723
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $380 $250 $380
5,569
kWh
-
07 2.6121: Reduce hot water temperature to the minimum required $91 $20 $91
1,465
kWh
-
TOTAL RECOMMENDED $5,588 $5,580 $5,828
86,752
kWh
$(-240.0)
TOTAL IMPLEMENTED $888 $810 $888
13,188
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs