ITAC Assessment: DS0001
ITAC logo
ITAC Assessment: DS0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Signs
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $5
M
to 10
M
# of Employees 117
Plant Area 72,500
ft2
Annual Production 49,000
pieces
Production Hrs. Annual 3,380
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,624 726,553
kWh
Natural Gas $20,240 4,712
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,990 $12,650 $2,990
68,581
kWh
-
02 2.7135: Install occupancy sensors $70 $120 $70
1,465
kWh
-
03 2.7494: Install storm windows and doors $140 $280 - $140
-
MMBtu
04 2.7494: Install storm windows and doors $1,130 $8,200 - $1,130
-
MMBtu
05 2.7494: Install storm windows and doors $740 $20 - $740
-
MMBtu
06 2.7492: Use proper thickness of insulation on building envelope $4,760 $44,950 - $4,760
-
MMBtu
07 2.4133: Use most efficient type of electric motors $130 $690 $130
3,224
kWh
-
08 2.7231: Use radiant heater for spot heating $9,150 $34,800 - $9,150
-
MMBtu
TOTAL RECOMMENDED $19,110 $101,710 $3,190
73,270
kWh
$15,920
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs