ITAC Assessment: AM0472
ITAC logo
ITAC Assessment: AM0472
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Livestock feed
NAICS 311119: Other Animal Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $5
M
to 10
M
# of Employees 32
Plant Area 47,000
ft2
Annual Production 73,500
ton
Production Hrs. Annual 6,024
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,226 2,531,406
kWh
Electricity Fees $6,277 -
Natural Gas $63,841 7,626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,090

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2113: Repair or replace steam traps $6,580 $590 - $6,580
-
MMBtu
02 2.2511: Insulate bare equipment $6,640 $720 - $6,640
-
MMBtu
03 2.4314: Use synthetic lubricant $2,630 - $2,630
43,560
kWh
-
04 2.7124: Make a practice of turning off lights when not needed $950 $290 $950
17,460
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,000 $200 $1,000
18,100
kWh
-
06 2.7145: Install skylights $920 - $920
16,700
kWh
-
TOTAL RECOMMENDED $18,720 $1,800 $5,500
95,820
kWh
$13,220
-
MMBtu
TOTAL IMPLEMENTED $16,090 $1,800 $2,870
52,260
kWh
$13,220
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs