ITAC Assessment: ME0117
ITAC logo
ITAC Assessment: ME0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Corrugated containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 160,000
ft2
Annual Production 47,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $362,638 4,405,627
kWh
LPG $19,435 2,758
MMBtu
Fuel Oil #2 $128,972 28,291
MMBtu
Fuel Oil #4 $130,897 57,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,976 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,377 $150 - $1,377
-
MMBtu
02 2.3212: Optimize plant power factor $3,110 $4,500 $3,110
-
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $228 $100 $228
2,931
kWh
-
04 2.2444: Use hot process fluids to preheat incoming process fluids $6,190 $8,500 $401
4,982
kWh
$5,789
-
MMBtu
05 2.1213: Direct warmest air to combustion intake $1,071 $900 - $1,071
-
MMBtu
TOTAL RECOMMENDED $11,976 $14,150 $3,739
7,913
kWh
$8,237
-
MMBtu
TOTAL IMPLEMENTED $228 $100 $228
2,931
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs