Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

356

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Signs and advertising specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0323 #01 Y:1998 Treat and reuse rinse waters $6,555 $1,475
UM0108 #05 Y:1997 Add additional production shift $4,322 -
UM0108 #04 Y:1997 Use closed cycle process to minimize waste water production $418 $500
UM0108 #03 Y:1997 Use radiant heater for spot heating $3,876 $2,400
UM0108 #02 Y:1997 Install vinyl strip / high speed / air curtain doors $4,032 $1,035
UM0108 #01 Y:1997 Change rate schedules or other changes in utility service $17,244 $40,250
OD0095 #04 Y:1997 Lease / purchase baler; sell cardboard to recycler $2,126 -
OD0095 #03 Y:1997 Recover waste heat from equipment $1,935 $2,025
OD0095 #02 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $171 $289
OD0095 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $3,962 $8,508
CO0399 #07 Y:1997 Replace existing equipment with more suitable substitutes $12,870 $1,100
CO0399 #06 Y:1997 Hire additional personnel to reduce changeout time $45,100 $13,100
CO0399 #05 Y:1997 Use a rag recycle service $480 -
CO0399 #04 Y:1997 Improve combustion control capability $320 $750
CO0399 #03 Y:1997 Install vinyl strip / high speed / air curtain doors $490 $1,660
CO0399 #02 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $1,240 $600
CO0399 #01 Y:1997 Utilize higher efficiency lamps and/or ballasts $937 $2,504
OR0306 #05 Y:1997 Upgrade obsolete equipment $80 -
OR0306 #04 Y:1997 Disconnect ballasts $2,422 $3,120
OR0306 #03 Y:1997 Reduce space conditioning during non-working hours $18,530 $5,000