Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Brooms and brushes
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0036 #05 Y:2009 Reduce the pressure of compressed air to the minimum required $4,231 -
DL0036 #04 Y:2009 Recover waste heat from equipment $4,127 $1,430
DL0036 #03 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $5,802 $4,000
DL0036 #02 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $16,987 $18,000
DL0036 #01 Y:2009 Recycle air for heating, ventilation and air conditioning $26,142 $14,000
UD0771 #09 Y:2007 Disconnect ballasts $304 -
UD0771 #08 Y:2007 Insulate bare equipment $1,182 $1,450
UD0771 #07 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,102 $3,285
UD0771 #06 Y:2007 Utilize energy-efficient belts and other improved mechanisms $1,180 -
UD0771 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,830 $10,000
UD0771 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $3,639 $8,838
UD0771 #03 Y:2007 Utilize higher efficiency lamps and/or ballasts $4,341 $7,780
UD0771 #02 Y:2007 Recover waste heat from equipment $5,342 $600
UD0771 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $11,208 $22,275
SD0297 #06 Y:2002 Install equipment (eg compactor) to reduce disposal costs $3,420 $5,000
SD0297 #05 Y:2002 Utilize higher efficiency lamps and/or ballasts $1,218 $2,728
SD0297 #04 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $1,292 $500
SD0297 #03 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $1,846 $440
SD0297 #02 Y:2002 Install occupancy sensors $15,891 $500
SD0297 #01 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $20,530 $39,000