Assessment Year | 2002 |
---|---|
Principal Product | Brushes, brooms, mops |
NAICS |
n/a
|
SIC | 3991: Brooms and Brushes |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
98,000
ft2
|
Annual Production | 1,800,000
pieces
|
Production Hrs. Annual | 2,146
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,701 | 528,720 |
kWh
|
$0.11 |
Electricity Demand | $19,727 | 2,359 |
kW-mo/yr
|
$8.36 |
Electricity Fees | $720 | - |
|
- |
Natural Gas | $1,467 | 124 |
MMBtu
|
$11.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,197 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,029 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $20,530 | $39,000 |
$15,573
106,074
kWh
|
$4,957
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $15,891 | $500 |
$9,852
90,300
kWh
|
$6,039
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,846 | $440 |
$1,292
11,845
kWh
|
$554
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,292 | $500 |
$904
8,288
kWh
|
$388
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,218 | $2,728 |
$853
7,819
kWh
|
$365
-
kW-mo/yr
|
- | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,420 | $5,000 | - | - |
$3,420
-
lb
|
|
TOTAL RECOMMENDED | $44,197 | $48,168 |
$28,474
224,326
kWh
|
$12,303
-
kW-mo/yr
|
$3,420
-
lb
|
||
TOTAL IMPLEMENTED | $19,029 | $1,440 |
$12,048
110,433
kWh
|
$6,981
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs