Assessment Year | 2009 |
---|---|
Principal Product | brush |
NAICS | 339994: Broom, Brush, and Mop Manufacturing |
SIC | 3991: Brooms and Brushes |
Sales Range | less than $500 k |
# of Employees | 79 |
Plant Area |
150,000
ft2
|
Annual Production | 3,800,000
pieces
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,447 | 1,207,681 |
kWh
|
$0.12 |
Fuel Oil #2 | $10,627 | 526 |
MMBtu
|
$20.20 |
Other Gas | $18,389 | 942 |
MMBtu
|
$19.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,858 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,827 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Other Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7313: Recycle air for heating, ventilation and air conditioning | $26,142 | $14,000 | - |
$9,411
-
MMBtu
|
$16,731
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,987 | $18,000 |
$16,987
139,230
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,802 | $4,000 |
$5,802
47,557
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $4,127 | $1,430 | - |
$4,127
-
MMBtu
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,231 | - |
$4,231
34,677
kWh
|
- | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $596 | - |
$596
4,880
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $231 | $594 |
$231
1,890
kWh
|
- | - | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $1,742 | $10,500 |
$(-287.0)
(-2,352)
kWh
|
- |
$2,029
-
MMBtu
|
|
TOTAL RECOMMENDED | $59,858 | $48,524 |
$27,560
225,882
kWh
|
$13,538
-
MMBtu
|
$18,760
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,827 | - |
$4,827
39,557
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Other Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs