| Assessment Year | 2005 |
|---|---|
| Principal Product | Transformers |
| NAICS | 335311: Power, Distribution, and Specialty Transformer Manufacturing |
| SIC | 3612: Power, Distribution, and Specialty Transformers |
| Sales Range | $50 M to 100M |
| # of Employees | 499 |
| Plant Area |
650,000
ft2
|
| Annual Production | 150,000
pieces
|
| Production Hrs. Annual | 4,106
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,070,008 | 25,512,124 |
kWh
|
$0.042 |
| Natural Gas | $564,128 | 86,758 |
MMBtu
|
$6.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $63,029 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,082 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,890 | $450 | - |
$7,340
-
MMBtu
|
$(-450.0) | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,582 | $3,682 |
$4,582
134,686
kWh
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,040 | $280,000 |
$1,040
30,426
kWh
|
- | - | - | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $4,608 | $12,000 |
$5,208
152,717
kWh
|
- | - | $(-600.0) | |
| 05 | 2.2437: Recover waste heat from equipment | $29,409 | $260,000 | - |
$29,409
-
MMBtu
|
- | - | |
| 06 | 2.4226: Use / purchase optimum sized compressor | $16,500 | $60,000 |
$16,500
483,524
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $63,029 | $616,132 |
$27,330
801,353
kWh
|
$36,749
-
MMBtu
|
$(-450.0) | $(-600.0) | ||
| TOTAL IMPLEMENTED | $21,082 | $63,682 |
$21,082
618,210
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs