Assessment Year 1987
Principal Product HOUSEHOLD BRUSHES
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area
n/a
Annual Production 6,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,744 3,220,985
kWh
Natural Gas $29,411 5,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,527

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $6,500 $480 $6,500
98,476
kWh
- -
02 2.2113: Repair or replace steam traps $1,541 $600 - $2,141
-
MMBtu
$(-600.0)
03 2.7243: Improve air circulation with destratification fans / other methods $7,184 $9,600 - $7,184
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,442 $406 $3,442
52,169
kWh
- -
05 2.3212: Optimize plant power factor $9,555 $28,800 $9,555
144,783
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $860 - $860
12,896
kWh
- -
TOTAL RECOMMENDED $29,082 $39,886 $20,357
308,324
kWh
$9,325
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $19,527 $11,086 $10,802
163,541
kWh
$9,325
-
MMBtu
$(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs