ITAC Assessment: GT0689
ITAC logo
ITAC Assessment: GT0689
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product PVC Pipe And Vinyl Siding
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 255
Plant Area 983,000
ft2
Annual Production 51,983
ton
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $604,296 19,421,161
kWh
Electricity Demand $188,279 15,669
kW-mo/yr
Electricity Fees $47,865 -
Natural Gas $5,429 878
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $574,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $32,450 - n/a - - - - $32,450 - -
02 3.5112: Reprocess spent oils on site for re-use $9,458 $8,900 n/a - - $2,552
-
gal
$(-300.0) - $7,206 -
03 4.441: Install automatic packing equipment $72,000 $112,000 n/a - - - $72,000 - - -
04 4.451: Add additional production shift $336,000 $225,000 n/a - - - - - - $336,000
05 2.7111: Reduce illumination to minimum necessary levels $1,495 $2,000 n/a $1,410
36,342
kWh
$85 - - - - -
06 3.5212: Regrind, reuse, or sell scrap plastic parts $82,231 - n/a $51,727
1,643,904
kWh
$3,104 - $27,400 - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,460 $32,400 n/a $6,094
201,641
kWh
$366 - - - - -
08 2.7111: Reduce illumination to minimum necessary levels $16,070 $61,209 n/a $15,163
519,930
kWh
$907 - - - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,228 - n/a $1,158
35,756
kWh
$70 - - - - -
10 2.4133: Use most efficient type of electric motors $17,362 $72,500 n/a $4,587
113,130
kWh
$275 - $12,500 - - -
TOTAL RECOMMENDED $574,754 $514,009 $80,139
2,550,703
kWh
$4,807 $2,552
-
gal
$111,600 $32,450 $7,206 $336,000
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs