ITAC Assessment: UD0782
ITAC logo
ITAC Assessment: UD0782
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Ball and Roller Bearings
NAICS 332991: Ball and Roller Bearing Manufacturing
SIC 3562: Ball and Roller Bearings
Sales Range $100
M
to 500
M
# of Employees 205
Plant Area 133,000
ft2
Annual Production 1,640,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,398 6,606,600
kWh
Electricity Demand $88,814 1,102
kW-mo/yr
Natural Gas $111,820 10,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $28,951 - $28,951
689,304
kWh
- -
02 2.7135: Install occupancy sensors $5,748 $6,528 $5,748
136,858
kWh
- -
03 2.7231: Use radiant heater for spot heating $5,068 $20,000 - - $5,068
-
MMBtu
04 2.7124: Make a practice of turning off lights when not needed $4,245 - $4,245
101,059
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,643 - $1,793
42,680
kWh
$850
-
kW-mo/yr
-
06 2.7131: Add area lighting switches $3,233 $10,000 $3,233
76,982
kWh
- -
07 2.4239: Eliminate or reduce compressed air usage $2,243 $1,800 $1,074
25,561
kWh
$1,169
-
kW-mo/yr
-
08 2.2443: Re-use or recycle hot or cold process exhaust air $1,292 $2,000 - - $1,292
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,907 $1,000 $2,245
53,460
kWh
$662
-
kW-mo/yr
-
TOTAL RECOMMENDED $56,330 $41,328 $47,289
1,125,904
kWh
$2,681
-
kW-mo/yr
$6,360
-
MMBtu
TOTAL IMPLEMENTED $47,327 $19,328 $45,496
1,083,224
kWh
$1,831
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs