16
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Brooms and brushes | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| GT0726 #06 Y:2001 | 06 | 2001 | Utilize energy-efficient belts and other improved mechanisms | $45 | $58 | |
| GT0726 #05 Y:2001 | 05 | 2001 | Reduce the pressure of compressed air to the minimum required | $444 | - | |
| GT0726 #04 Y:2001 | 04 | 2001 | Insulate bare equipment | $115 | $185 | |
| GT0726 #03 Y:2001 | 03 | 2001 | Replace fossil fuel equipment with electrical equipment | $13,353 | $11,475 | |
| GT0726 #02 Y:2001 | 02 | 2001 | Install occupancy sensors | $377 | $1,000 | |
| GT0726 #01 Y:2001 | 01 | 2001 | Utilize higher efficiency lamps and/or ballasts | $2,034 | $3,696 | |
| GT0489 #06 Y:1992 | 06 | 1992 | Analyze flue gas for proper air/fuel ratio | $1,290 | $450 | |
| GT0489 #05 Y:1992 | 05 | 1992 | Utilize daylight whenever possible in lieu of artificial light | $560 | $580 | |
| GT0489 #04 Y:1992 | 04 | 1992 | Utilize higher efficiency lamps and/or ballasts | $2,410 | $9,100 | |
| GT0489 #03 Y:1992 | 03 | 1992 | Install compressor air intakes in coolest locations | $190 | $250 | |
| GT0489 #02 Y:1992 | 02 | 1992 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,700 | $1,200 | |
| GT0489 #01 Y:1992 | 01 | 1992 | Reduce the pressure of compressed air to the minimum required | $400 | - | |
| GT0127 #04 Y:1982 | 04 | 1982 | Use most efficient type of electric motors | $294 | $414 | |
| GT0127 #03 Y:1982 | 03 | 1982 | Utilize higher efficiency lamps and/or ballasts | $1,384 | $345 | |
| GT0127 #02 Y:1982 | 02 | 1982 | Install timers and/or thermostats | $2,466 | $1,500 | |
| GT0127 #01 Y:1982 | 01 | 1982 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,156 | $180 |