ITAC Assessment: GT0489
ITAC logo
ITAC Assessment: GT0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Cleaning Brushes
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 113,000
ft2
Annual Production 2,200,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,179 654,748
kWh
Natural Gas $18,662 3,353
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $400 - $400
4,689
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,700 $1,200 $3,700
43,962
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $190 $250 $190
2,345
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,410 $9,100 $2,410
28,722
kWh
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $560 $580 $560
6,741
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,290 $450 - $1,290
-
MMBtu
TOTAL RECOMMENDED $8,550 $11,580 $7,260
86,459
kWh
$1,290
-
MMBtu
TOTAL IMPLEMENTED $2,410 $9,100 $2,410
28,722
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs