| Assessment Year | 2002 |
|---|---|
| Principal Product | Brushes |
| NAICS |
n/a
|
| SIC | 3991: Brooms and Brushes |
| Sales Range | $10 M to 50M |
| # of Employees | 59 |
| Plant Area |
106,000
ft2
|
| Annual Production | 625,000
pieces
|
| Production Hrs. Annual | 4,250
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,085 | 1,192,891 |
kWh
|
$0.090 |
| Natural Gas | $72,219 | 5,391 |
MMBtu
|
$13.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,368 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,526 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,034 | $3,696 |
$704
18,039
kWh
|
$1,330
-
kW-mo/yr
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $377 | $1,000 |
$355
9,116
kWh
|
- | - | $22 | |
| 03 | 2.1321: Replace fossil fuel equipment with electrical equipment | $13,353 | $11,475 |
$(-43,425.0)
(-1,111,903)
kWh
|
- |
$56,778
-
MMBtu
|
- | |
| 04 | 2.2511: Insulate bare equipment | $115 | $185 | - | - |
$115
-
MMBtu
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $444 | - |
$415
11,372
kWh
|
- | - | $29 | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $45 | $58 |
$45
698
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $16,368 | $16,414 |
$(-41,906.0)
(-1,072,678)
kWh
|
$1,330
-
kW-mo/yr
|
$56,893
-
MMBtu
|
$51 | ||
| TOTAL IMPLEMENTED | $2,526 | $4,881 |
$1,059
27,155
kWh
|
$1,330
-
kW-mo/yr
|
$115
-
MMBtu
|
$22 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs