ITAC Assessment: GT0726
ITAC logo
ITAC Assessment: GT0726
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Brushes
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $10
M
to 50
M
# of Employees 59
Plant Area 106,000
ft2
Annual Production 625,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,085 1,192,891
kWh
Natural Gas $72,219 5,391
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,526

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,034 $3,696 $704
18,039
kWh
$1,330
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $377 $1,000 $355
9,116
kWh
- - $22
03 2.1321: Replace fossil fuel equipment with electrical equipment $13,353 $11,475 $(-43,425.0)
(-1,111,903)
kWh
- $56,778
-
MMBtu
-
04 2.2511: Insulate bare equipment $115 $185 - - $115
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $444 - $415
11,372
kWh
- - $29
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $45 $58 $45
698
kWh
- - -
TOTAL RECOMMENDED $16,368 $16,414 $(-41,906.0)
(-1,072,678)
kWh
$1,330
-
kW-mo/yr
$56,893
-
MMBtu
$51
TOTAL IMPLEMENTED $2,526 $4,881 $1,059
27,155
kWh
$1,330
-
kW-mo/yr
$115
-
MMBtu
$22
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs