Assessment Year | 1995 |
---|---|
Principal Product | newspaper inserts and advertising circulars |
NAICS |
n/a
|
SIC | 2725: |
Sales Range | $5 M to 10M |
# of Employees | 120 |
Plant Area |
70,000
ft2
|
Annual Production | 1,114,000,000
pieces
|
Production Hrs. Annual | 8,570
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $247,827 | 6,147,128 |
kWh
|
$0.040 |
Natural Gas | $120,221 | 32,672 |
MMBtu
|
$3.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,389 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,428 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $144 | - |
$144
2,931
kWh
|
- | - | - | |
02 | 2.4237: Substitute compressed air cooling with water or air cooling | $8,721 | $200 |
$8,579
211,899
kWh
|
- |
$129
-
Tgal
|
$13
-
gal
|
|
03 | 2.4221: Install compressor air intakes in coolest locations | $1,150 | $600 |
$1,150
28,429
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,186 | $682 |
$1,186
29,308
kWh
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $20,050 | $14,480 |
$20,050
495,604
kWh
|
- | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $98 | $150 | - |
$98
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40 | $285 |
$40
879
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $31,389 | $16,397 |
$31,149
769,050
kWh
|
$98
-
MMBtu
|
$129
-
Tgal
|
$13
-
gal
|
||
TOTAL IMPLEMENTED | $1,428 | $832 |
$1,330
32,239
kWh
|
$98
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs