ITAC Assessment: ND0215
ITAC logo
ITAC Assessment: ND0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product newspaper inserts and advertising circulars
NAICS
n/a
SIC 2725:
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 70,000
ft2
Annual Production 1,114,000,000
pieces
Production Hrs. Annual 8,570
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,827 6,147,128
kWh
Natural Gas $120,221 32,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,389 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,428

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
01 2.6218: Turn off equipment when not in use $144 - $144
2,931
kWh
- - -
02 2.4237: Substitute compressed air cooling with water or air cooling $8,721 $200 $8,579
211,899
kWh
- $129
-
Tgal
$13
-
gal
03 2.4221: Install compressor air intakes in coolest locations $1,150 $600 $1,150
28,429
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,186 $682 $1,186
29,308
kWh
- - -
05 2.4133: Use most efficient type of electric motors $20,050 $14,480 $20,050
495,604
kWh
- - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $98 $150 - $98
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $40 $285 $40
879
kWh
- - -
TOTAL RECOMMENDED $31,389 $16,397 $31,149
769,050
kWh
$98
-
MMBtu
$129
-
Tgal
$13
-
gal
TOTAL IMPLEMENTED $1,428 $832 $1,330
32,239
kWh
$98
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs