Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,460

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous manufacturing industries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1124 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,261 $6,149
UD1124 #04 Y:2025 Install vinyl strip / high speed / air curtain doors $198 $375
UD1124 #03 Y:2025 Use properly designed and sized hvac equipment $9,836 $1,500
UD1124 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $165 -
UD1124 #01 Y:2025 Recharge batteries on during off-peak demand periods $2,950 -
UD1123 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,634 $6,580
UD1123 #03 Y:2025 Install occupancy sensors $757 $247
UD1123 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $5,778 -
UD1123 #01 Y:2025 Use properly designed and sized hvac equipment $7,271 -
CC0042 #06 Y:2025 Minimize use of outside make-up air for ventilation except when used for economizer cycle $9,158 $8,500
CC0042 #05 Y:2025 Use solar heat to make electricty $33,575 $187,740
CC0042 #04 Y:2025 Insulate bare equipment $38,059 $9,385
CC0042 #03 Y:2025 Make a practice of turning off lights when not needed $1,748 -
CC0042 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $912 $420
CC0042 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,083 $8,883
IC0316 #13 Y:2024 Replace boiler $36,754 $57,900
IC0316 #12 Y:2024 Use demand controller or load shedder $1,025 $1,615
IC0316 #11 Y:2024 Recharge batteries on during off-peak demand periods $2,060 -
IC0316 #10 Y:2024 Utilize higher efficiency lamps and/or ballasts $525 $205
IC0316 #09 Y:2024 Use most efficient type of electric motors $3,406 $3,393