Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Marking devices
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0155 #11 Y:2002 Make a practice of turning off lights when not needed $326 -
SU0155 #10 Y:2002 Analyze flue gas for proper air/fuel ratio $381 $500
SU0155 #09 Y:2002 Install vinyl strip / high speed / air curtain doors $901 $1,660
SU0155 #08 Y:2002 Recover waste heat from equipment $1,406 $420
SU0155 #07 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $1,755 $320
SU0155 #06 Y:2002 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $2,195 $4,877
SU0155 #05 Y:2002 Install equipment (eg compactor) to reduce disposal costs $4,016 -
SU0155 #04 Y:2002 Change procedures / equipment / operating conditions $4,056 -
SU0155 #03 Y:2002 Close holes and openings in building such as broken windows $4,200 $8,636
SU0155 #02 Y:2002 Reschedule plant operations or reduce load to avoid peaks $17,787 $1,200
SU0155 #01 Y:2002 Re-arrange equipment layout to reduce labor costs $20,634 $768
LE0143 #06 Y:2002 Use synthetic lubricant $793 $400
LE0143 #05 Y:2002 Use waste heat from hot flue gases to preheat $655 $6,500
LE0143 #04 Y:2002 Install / repair insulation on steam lines $166 $195
LE0143 #03 Y:2002 Utilize energy-efficient belts and other improved mechanisms $2,286 -
LE0143 #02 Y:2002 Install compressor air intakes in coolest locations $1,009 $1,000
LE0143 #01 Y:2002 Reschedule plant operations or reduce load to avoid peaks $4,545 $2,500
BD0151 #07 Y:1999 Install automatic packing equipment $1,932 $8,000
BD0151 #06 Y:1999 Reprocess spent oils on site for re-use $1,181 $800
BD0151 #05 Y:1999 Use most efficient type of electric motors $781 $1,320