SU0155 #11 Y:2002 | 11 | 2002 | Make a practice of turning off lights when not needed | $326 | - | |
SU0155 #10 Y:2002 | 10 | 2002 | Analyze flue gas for proper air/fuel ratio | $381 | $500 | |
SU0155 #09 Y:2002 | 09 | 2002 | Install vinyl strip / high speed / air curtain doors | $901 | $1,660 | |
SU0155 #08 Y:2002 | 08 | 2002 | Recover waste heat from equipment | $1,406 | $420 | |
SU0155 #07 Y:2002 | 07 | 2002 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,755 | $320 | |
SU0155 #06 Y:2002 | 06 | 2002 | Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $2,195 | $4,877 | |
SU0155 #05 Y:2002 | 05 | 2002 | Install equipment (eg compactor) to reduce disposal costs | $4,016 | - | |
SU0155 #04 Y:2002 | 04 | 2002 | Change procedures / equipment / operating conditions | $4,056 | - | |
SU0155 #03 Y:2002 | 03 | 2002 | Close holes and openings in building such as broken windows | $4,200 | $8,636 | |
SU0155 #02 Y:2002 | 02 | 2002 | Reschedule plant operations or reduce load to avoid peaks | $17,787 | $1,200 | |
SU0155 #01 Y:2002 | 01 | 2002 | Re-arrange equipment layout to reduce labor costs | $20,634 | $768 | |
LE0143 #06 Y:2002 | 06 | 2002 | Use synthetic lubricant | $793 | $400 | |
LE0143 #05 Y:2002 | 05 | 2002 | Use waste heat from hot flue gases to preheat | $655 | $6,500 | |
LE0143 #04 Y:2002 | 04 | 2002 | Install / repair insulation on steam lines | $166 | $195 | |
LE0143 #03 Y:2002 | 03 | 2002 | Utilize energy-efficient belts and other improved mechanisms | $2,286 | - | |
LE0143 #02 Y:2002 | 02 | 2002 | Install compressor air intakes in coolest locations | $1,009 | $1,000 | |
LE0143 #01 Y:2002 | 01 | 2002 | Reschedule plant operations or reduce load to avoid peaks | $4,545 | $2,500 | |
BD0151 #07 Y:1999 | 07 | 1999 | Install automatic packing equipment | $1,932 | $8,000 | |
BD0151 #06 Y:1999 | 06 | 1999 | Reprocess spent oils on site for re-use | $1,181 | $800 | |
BD0151 #05 Y:1999 | 05 | 1999 | Use most efficient type of electric motors | $781 | $1,320 |