Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lead pencils, crayons, and artists' materials
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MO0273 #07 Y:1999 Install equipment to move product $38,200 $3,000
MO0273 #06 Y:1999 Reschedule plant operations or reduce load to avoid peaks $2,960 -
MO0273 #05 Y:1999 Burn wood by-products for heat $6,510 $2,500
MO0273 #04 Y:1999 Install occupancy sensors $435 $364
MO0273 #03 Y:1999 Replace electrically-operated equipment with fossil fuel equipment $2,777 $6,200
MO0273 #02 Y:1999 Replace boiler $35,241 $30,000
MO0273 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $11,255 $15,503
MS0117 #04 Y:1998 Re-arrange equipment layout to reduce handling costs $1,404 $1,944
MS0117 #03 Y:1998 Recover waste heat from equipment $1,757 $2,405
MS0117 #02 Y:1998 Install outside air damper / economizer on hvac unit $4,835 $19,820
MS0117 #01 Y:1998 Install timers and/or thermostats $2,837 $2,832
MA0285 #08 Y:1993 Install / repair insulation on steam lines $900 $320
MA0285 #07 Y:1993 Utilize higher efficiency lamps and/or ballasts $4,120 $7,480
MA0285 #06 Y:1993 Recover and reuse cooling water $4,616 $385
MA0285 #05 Y:1993 Recover waste heat from equipment $9,189 $7,537
MA0285 #04 Y:1993 Insulate glazing, walls, ceilings, and roofs $20,398 $47,520
MA0285 #03 Y:1993 Replace boiler $26,214 -
MA0285 #02 Y:1993 Recover waste heat from equipment $55,888 $14,720
MA0285 #01 Y:1993 Purchase gas directly from a contract gas supplier $109,286 $73,056
TN0403 #10 Y:1990 Eliminate leaks in inert gas and compressed air lines/ valves $161 $90