| Assessment Year | 1990 |
|---|---|
| Principal Product | PENCIL LEADS |
| NAICS |
n/a
|
| SIC | 3952: Lead Pencils, Crayons, and Artists' Materials |
| Sales Range | $1 M to 5M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 1,800,000
pieces
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,356 | 2,250,586 |
kWh
|
$0.055 |
| Natural Gas | $22,467 | 4,515 |
MMBtu
|
$4.98 |
| Fuel Oil #2 | $32,398 | 7,039 |
MMBtu
|
$4.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,162 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,484 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2162: Reduce excess steam bleeding | $5,335 | $1,280 | - |
$2,085
-
MMBtu
|
$3,250
-
MMBtu
|
- | |
| 02 | 2.2511: Insulate bare equipment | $4,167 | $2,442 | - |
$3,865
-
MMBtu
|
$302
-
MMBtu
|
- | |
| 03 | 2.2425: Use flue gases to heat process or service water | $1,886 | $4,964 |
$1,886
34,291
kWh
|
- | - | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $501 | $356 | - |
$195
-
MMBtu
|
$306
-
MMBtu
|
- | |
| 05 | 2.2122: Install / repair insulation on condensate lines | $213 | $300 | - |
$85
-
MMBtu
|
$128
-
MMBtu
|
- | |
| 06 | 2.6232: Install set-back timers | $532 | - |
$532
9,672
kWh
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $742 | $236 |
$742
13,482
kWh
|
- | - | - | |
| 08 | 2.4312: Improve lubrication practices | $322 | $180 |
$322
5,862
kWh
|
- | - | - | |
| 09 | 2.7123: Keep lamps and reflectors clean | $303 | $963 |
$274
4,982
kWh
|
- | - | $29 | |
| 10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $161 | $90 |
$161
2,931
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $14,162 | $10,811 |
$3,917
71,220
kWh
|
$6,230
-
MMBtu
|
$3,986
-
MMBtu
|
$29 | ||
| TOTAL IMPLEMENTED | $7,484 | $2,262 |
$1,435
26,085
kWh
|
$2,365
-
MMBtu
|
$3,684
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs