Assessment Year | 2000 |
---|---|
Principal Product | Lead Pencils |
NAICS |
n/a
|
SIC | 3952: Lead Pencils, Crayons, and Artists' Materials |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
118,000
ft2
|
Annual Production | 432,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,361 | 2,387,749 |
kWh
|
$0.053 |
Electricity Demand | $16,943 | 703 |
kW-mo/yr
|
$24.10 |
Electricity Fees | $18,093 | - |
|
- |
Natural Gas | $35,677 | 10,663 |
MMBtu
|
$3.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $97,378 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $46,496 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,255 | $15,503 |
$10,212
169,988
kWh
|
$1,043
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.1224: Replace boiler | $35,241 | $30,000 | - | - |
$35,241
-
MMBtu
|
- | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,777 | $6,200 |
$4,404
87,925
kWh
|
$356
-
kW-mo/yr
|
$(-1,983.0)
-
MMBtu
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $435 | $364 | - | - | - | - | - | $435 | |
05 | 3.6123: Burn wood by-products for heat | $6,510 | $2,500 | - | - | - |
$6,510
-
lb
|
- | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,960 | - | - | - | - | - | - | $2,960 | |
07 | 4.445: Install equipment to move product | $38,200 | $3,000 | - | - | - | - | $38,200 | - | |
TOTAL RECOMMENDED | $97,378 | $57,567 |
$14,616
257,913
kWh
|
$1,399
-
kW-mo/yr
|
$33,258
-
MMBtu
|
$6,510
-
lb
|
$38,200 | $3,395 | ||
TOTAL IMPLEMENTED | $46,496 | $45,503 |
$10,212
169,988
kWh
|
$1,043
-
kW-mo/yr
|
$35,241
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs