ITAC Assessment: IC0290
ITAC logo
ITAC Assessment: IC0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Office Space
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 80
Plant Area 33,145
ft2
Annual Production 1
units
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,215 2,482,398
kWh
Electricity Demand $44,802 5,313
kW-mo/yr
Electricity Fees $61,581 -
Other Energy $1,375 71
MMBtu
TOTAL YEARLY COSTS $263,972
RECOMMENDED SAVINGS* $61,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,130 - $670
10,646
kWh
$460
-
kW-mo/yr
02 2.7135: Install occupancy sensors $745 $2,043 $436
6,936
kWh
$309
-
kW-mo/yr
03 2.7241: Install outside air damper / economizer on hvac unit $4,981 $19,147 $4,022
63,948
kWh
$959
-
kW-mo/yr
04 2.9114: Use solar heat to make electricty $34,431 $392,519 $28,952
460,280
kWh
$5,480
-
kW-mo/yr
05 2.7232: Replace existing hvac unit with high efficiency model $19,851 $34,225 $11,765
187,041
kWh
$8,086
-
kW-mo/yr
TOTAL RECOMMENDED $61,137 $447,933 $45,845
728,851
kWh
$15,293
-
kW-mo/yr
TOTAL IMPLEMENTED $1,875 $2,043 $1,106
17,583
kWh
$769
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs