ITAC Assessment: OD0161
ITAC logo
ITAC Assessment: OD0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Converted paper products
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 152,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,340
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,222 766,413
kWh
Electricity Demand $15,926 -
Electricity Fees $1,729 -
Natural Gas $45,943 11,476
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,593 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $2,365 $5,892 $2,365
-
MMBtu
-
02 4.111: Add equipment/ operators to reduce production bottleneck $3,900 $3,000 - $3,900
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,027 $1,500 $1,027
-
MMBtu
-
04 2.2135: Repair and eliminate steam leaks $1,013 $1,360 $1,013
-
MMBtu
-
05 2.2113: Repair or replace steam traps $2,084 $700 $2,084
-
MMBtu
-
06 2.8123: Pay utility bills on time $204 - - $204
TOTAL RECOMMENDED $10,593 $12,452 $6,489
-
MMBtu
$4,104
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs