Assessment Year | 1993 |
---|---|
Principal Product | drafting paper |
NAICS |
n/a
|
SIC | 3952: Lead Pencils, Crayons, and Artists' Materials |
Sales Range | $10 M to 50M |
# of Employees | 101 |
Plant Area |
108,000
ft2
|
Annual Production | 37,666
thousand feet
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $344,878 | 3,803,048 |
kWh
|
$0.091 |
Natural Gas | $340,491 | 51,231 |
MMBtu
|
$6.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $230,611 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,214 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $109,286 | $73,056 | - |
$109,286
-
MMBtu
|
- | |
02 | 2.2437: Recover waste heat from equipment | $55,888 | $14,720 | - |
$55,888
-
MMBtu
|
- | |
03 | 2.1224: Replace boiler | $26,214 | - | - |
$26,214
-
MMBtu
|
- | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $20,398 | $47,520 | - |
$20,398
-
MMBtu
|
- | |
05 | 2.2437: Recover waste heat from equipment | $9,189 | $7,537 | - |
$9,189
-
MMBtu
|
- | |
06 | 3.4115: Recover and reuse cooling water | $4,616 | $385 |
$(-266.0)
(-2,931)
kWh
|
- |
$4,882
-
Tgal
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,120 | $7,480 |
$4,120
47,186
kWh
|
- | - | |
08 | 2.2136: Install / repair insulation on steam lines | $900 | $320 | - |
$900
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $230,611 | $151,018 |
$3,854
44,255
kWh
|
$221,875
-
MMBtu
|
$4,882
-
Tgal
|
||
TOTAL IMPLEMENTED | $26,214 | - | - |
$26,214
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs