232
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
OR0805 #06 Y:2025 | 06 | 2025 | Use solar heat to make electricty | $103,946 | $1,750,000 |
n/a
|
OR0805 #05 Y:2025 | 05 | 2025 | Regrind, reuse, or sell scrap plastic parts | $5,605 | - |
n/a
|
OR0805 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,157 | $3,706 |
n/a
|
OR0805 #03 Y:2025 | 03 | 2025 | Turn off equipment during breaks, reduce operating time | $928 | - |
n/a
|
OR0805 #02 Y:2025 | 02 | 2025 | Minimize operation of equipment maintained in standby condition | $2,187 | - |
n/a
|
OR0805 #01 Y:2025 | 01 | 2025 | Eliminate or reduce compressed air usage | $26,892 | - |
n/a
|
TT0107 #03 Y:2013 | 03 | 2013 | Replace existing hvac unit with high efficiency model | $30,733 | $150,860 | |
TT0107 #02 Y:2013 | 02 | 2013 | Utilize higher efficiency lamps and/or ballasts | $2,667 | $6,750 | |
TT0107 #01 Y:2013 | 01 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,191 | $3,000 | |
WV0449 #14 Y:2012 | 14 | 2012 | Analyze flue gas for proper air/fuel ratio | $133 | $500 | |
WV0449 #13 Y:2012 | 13 | 2012 | Install / repair insulation on condensate lines | $633 | $771 | |
WV0449 #12 Y:2012 | 12 | 2012 | Use waste heat from hot flue gases to preheat | $734 | $1,630 | |
WV0449 #11 Y:2012 | 11 | 2012 | Install compressor air intakes in coolest locations | $803 | $1,484 | |
WV0449 #10 Y:2012 | 10 | 2012 | Eliminate or reduce compressed air usage | $808 | $1,242 | |
WV0449 #09 Y:2012 | 09 | 2012 | Install outside air damper / economizer on hvac unit | $1,258 | $1,084 | |
WV0449 #08 Y:2012 | 08 | 2012 | Install timers and/or thermostats | $1,302 | $605 | |
WV0449 #07 Y:2012 | 07 | 2012 | Develop a repair/replace policy | $2,133 | $637 | |
WV0449 #06 Y:2012 | 06 | 2012 | Recover waste heat from equipment | $2,472 | $4,330 | |
WV0449 #05 Y:2012 | 05 | 2012 | Use synthetic lubricant | $3,043 | $500 | |
WV0449 #04 Y:2012 | 04 | 2012 | Establish a preventative maintenance program | $3,821 | $1,000 |