ITAC Assessment: TT0107
ITAC logo
ITAC Assessment: TT0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Writing Instruments
NAICS 339940: Office Supplies (except Paper) Manufacturing
SIC 3951: Pens, Mechanical Pencils, and Parts
Sales Range $50
M
to 100
M
# of Employees 475
Plant Area 400,000
ft2
Annual Production 245,400,949
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $565,395 8,774,400
kWh
Electricity Demand $217,482 19,885
kW-mo/yr
Electricity Fees $(-112,235.0) -
Natural Gas $73,956 9,107
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,191 $3,000 $5,409
84,519
kWh
$1,782
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,667 $6,750 $1,816
28,382
kWh
$851
-
kW-mo/yr
03 2.7232: Replace existing hvac unit with high efficiency model $30,733 $150,860 $30,733
480,219
kWh
-
TOTAL RECOMMENDED $40,591 $160,610 $37,958
593,120
kWh
$2,633
-
kW-mo/yr
TOTAL IMPLEMENTED $9,858 $9,750 $7,225
112,901
kWh
$2,633
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs