ITAC Assessment: WV0002
ITAC logo
ITAC Assessment: WV0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Mining Equipments
NAICS
n/a
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 87,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,820 1,511,137
kWh
Fuel Oil #6 $28,659 5,331
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,433 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,925

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,508 $1,357 $4,508
132,474
kWh
-
02 2.4133: Use most efficient type of electric motors $1,068 $5,630 $1,068
27,550
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $473 $290 - $473
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $300 $86 - $300
-
MMBtu
05 2.7243: Improve air circulation with destratification fans / other methods $3,572 $5,700 - $3,572
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $25 $35 $25
586
kWh
-
07 2.2414: Use waste heat from hot flue gases to preheat $5,837 $690 - $5,837
-
MMBtu
08 2.6212: Turn off equipment during breaks, reduce operating time $650 - $539
13,775
kWh
$111
-
MMBtu
TOTAL RECOMMENDED $16,433 $13,788 $6,140
174,385
kWh
$10,293
-
MMBtu
TOTAL IMPLEMENTED $11,925 $12,431 $1,632
41,911
kWh
$10,293
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs