Assessment Year | 2022 |
---|---|
Principal Product | Pharmaceuticals |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
170,000
ft2
|
Annual Production | 1,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $591,706 | 11,741,214 |
kWh
|
$0.050 |
Electricity Demand | $147,629 | 20,148 |
kW-mo/yr
|
$7.33 |
Electricity Fees | $309 | - |
|
- |
Natural Gas | $344,214 | 80,202 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | $1,083,858 | |||
RECOMMENDED SAVINGS* | $90,960 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,683 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,646 | $1,000 |
$5,152
108,916
kWh
|
$1,094
-
kW-mo/yr
|
- | $(-600.0) | - | |
02 | 2.7314: Reduce ventilation air | $34,366 | $30,000 | - | - |
$34,366
-
MMBtu
|
- | - | |
03 | 2.7224: Reduce space conditioning during non-working hours | $2,702 | $1,750 | - | - |
$2,702
-
MMBtu
|
- | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $1,730 | - |
$1,730
36,577
kWh
|
- | - | - | - | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $26,728 | $32,000 | - | - |
$26,728
-
MMBtu
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,751 | - | - | - |
$5,751
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,037 | $29,375 |
$9,298
196,574
kWh
|
$1,974
-
kW-mo/yr
|
- | $1,828 | $937 | |
TOTAL RECOMMENDED | $90,960 | $94,125 |
$16,180
342,067
kWh
|
$3,068
-
kW-mo/yr
|
$69,547
-
MMBtu
|
$1,228 | $937 | ||
TOTAL IMPLEMENTED | $19,683 | $30,375 |
$14,450
305,490
kWh
|
$3,068
-
kW-mo/yr
|
- | $1,228 | $937 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs