ITAC Assessment: UD1038
ITAC logo
ITAC Assessment: UD1038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 170,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $591,706 11,741,214
kWh
Electricity Demand $147,629 20,148
kW-mo/yr
Electricity Fees $309 -
Natural Gas $344,214 80,202
MMBtu
TOTAL YEARLY COSTS $1,083,858
RECOMMENDED SAVINGS* $90,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,646 $1,000 $5,152
108,916
kWh
$1,094
-
kW-mo/yr
- $(-600.0) -
02 2.7314: Reduce ventilation air $34,366 $30,000 - - $34,366
-
MMBtu
- -
03 2.7224: Reduce space conditioning during non-working hours $2,702 $1,750 - - $2,702
-
MMBtu
- -
04 2.7224: Reduce space conditioning during non-working hours $1,730 - $1,730
36,577
kWh
- - - -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $26,728 $32,000 - - $26,728
-
MMBtu
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,751 - - - $5,751
-
MMBtu
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $14,037 $29,375 $9,298
196,574
kWh
$1,974
-
kW-mo/yr
- $1,828 $937
TOTAL RECOMMENDED $90,960 $94,125 $16,180
342,067
kWh
$3,068
-
kW-mo/yr
$69,547
-
MMBtu
$1,228 $937
TOTAL IMPLEMENTED $19,683 $30,375 $14,450
305,490
kWh
$3,068
-
kW-mo/yr
- $1,228 $937
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs