ITAC Assessment: OR0805
ITAC logo
ITAC Assessment: OR0805
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Ink Cartridges
NAICS 339940: Office Supplies (except Paper) Manufacturing
SIC 3955: Carbon Paper and Inked Ribbons
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 185,000
ft2
Annual Production 27,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $402,060 5,818,800
kWh
Electricity Demand $224,551 12,902
kW-mo/yr
Electricity Fees $66,608 -
Natural Gas $21,912 1,842
MMBtu
Waste Disposal Costs
Water Usage $34,610 2,848
Tgal
Solid Waste (non-haz) $11,628 140,500
lb
TOTAL YEARLY COSTS $761,369
RECOMMENDED SAVINGS* $143,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Solid Waste (non-haz) Savings
01 2.4239: Eliminate or reduce compressed air usage $26,892 - $26,892
389,180
kWh
- - -
02 2.6242: Minimize operation of equipment maintained in standby condition $2,187 - $2,187
31,560
kWh
- - -
03 2.6212: Turn off equipment during breaks, reduce operating time $928 - $928
13,423
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,157 $3,706 $3,057
44,241
kWh
$1,100
-
kW-mo/yr
- -
05 3.5212: Regrind, reuse, or sell scrap plastic parts $5,605 - - - $1,321
-
MMBtu
$4,284
-
lb
06 2.9114: Use solar heat to make electricty $103,946 $1,750,000 $57,699
835,286
kWh
$46,247
-
kW-mo/yr
- -
TOTAL RECOMMENDED $143,715 $1,753,706 $90,763
1,313,690
kWh
$47,347
-
kW-mo/yr
$1,321
-
MMBtu
$4,284
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs