ITAC Assessment: IC0243
ITAC logo
ITAC Assessment: IC0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 17
Plant Area 20,000
ft2
Annual Production 2,500,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,029 4,721,776
kWh
Electricity Demand $78,862 10,573
kW-mo/yr
Electricity Fees $76,060 -
Natural Gas $51,015 10,066
MMBtu
TOTAL YEARLY COSTS $425,966
RECOMMENDED SAVINGS* $237,704 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $190,093

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3322: Use existing dam to generate electricity $1,582 $31,846 $1,314
26,280
kWh
$268
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $37,674 $140,751 $14,716
294,318
kWh
$22,958
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $21,698 $6,150 $14,698
293,955
kWh
$7,000
-
kW-mo/yr
04 2.2211: Use optimum temperature $24,347 - $24,347
486,939
kWh
-
05 3.1293: Separate treatments for each type of solution and recycle $21,681 $40,000 $15,397
307,930
kWh
$6,285
-
kW-mo/yr
06 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $130,722 $713,750 $130,722
2,563,176
kWh
-
TOTAL RECOMMENDED $237,704 $932,497 $201,193
3,972,598
kWh
$36,511
-
kW-mo/yr
TOTAL IMPLEMENTED $190,093 $860,651 $160,136
3,151,449
kWh
$29,958
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs