Assessment Year | 2021 |
---|---|
Principal Product | Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 17 |
Plant Area |
20,000
ft2
|
Annual Production | 2,500,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $220,029 | 4,721,776 |
kWh
|
$0.047 |
Electricity Demand | $78,862 | 10,573 |
kW-mo/yr
|
$7.46 |
Electricity Fees | $76,060 | - |
|
- |
Natural Gas | $51,015 | 10,066 |
MMBtu
|
$5.07 |
TOTAL YEARLY COSTS | $425,966 | |||
RECOMMENDED SAVINGS* | $237,704 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $190,093 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.3322: Use existing dam to generate electricity | $1,582 | $31,846 |
$1,314
26,280
kWh
|
$268
-
kW-mo/yr
|
|
02 | 2.9114: Use solar heat to make electricty | $37,674 | $140,751 |
$14,716
294,318
kWh
|
$22,958
-
kW-mo/yr
|
|
03 | 2.4322: Use or replace with energy efficient substitutes | $21,698 | $6,150 |
$14,698
293,955
kWh
|
$7,000
-
kW-mo/yr
|
|
04 | 2.2211: Use optimum temperature | $24,347 | - |
$24,347
486,939
kWh
|
- | |
05 | 3.1293: Separate treatments for each type of solution and recycle | $21,681 | $40,000 |
$15,397
307,930
kWh
|
$6,285
-
kW-mo/yr
|
|
06 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $130,722 | $713,750 |
$130,722
2,563,176
kWh
|
- | |
TOTAL RECOMMENDED | $237,704 | $932,497 |
$201,193
3,972,598
kWh
|
$36,511
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $190,093 | $860,651 |
$160,136
3,151,449
kWh
|
$29,958
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs